About Saltbush
Saltbush Renewables is an Adelaide-based developer of utility-scale solar, wind and co-located battery storage in South Australia and western Victoria. It takes projects from site origination through land, approvals and grid connection to financial close, then manages construction and hands each project to its owner-operator. It was established in 2026 and begins operating in January 2027, with five projects totalling 1,510 MW in its opening pipeline.
About the role
The Document Controller keeps the records that prove each project's land rights, approvals, studies, contracts and decisions, so that any document can be found, trusted and shown to a buyer or lender. The role runs the document control system, naming rules and revision control across all projects. It exists because a pipeline that cannot produce its evidence on request does not have credibility, and due diligence tests this directly.
Terms
Full-time, permanent. Adelaide CBD, hybrid (three days a week in the office), with field travel to the Mid North, Limestone Coast and western Victoria. Reports to the Chief Financial Officer.
Remuneration
A$82,000 to A$95,000 plus 12 per cent superannuation. Industrial instrument: Clerks, Private Sector Award 2020 (MA000002), Level 4.
What you will do
1. Operate the document management system and set the folder structure, naming convention and metadata for every project.
2. Register, check, number and distribute incoming and outgoing documents, including consultant reports, drawings and correspondence with regulators.
3. Control revisions and approvals, and make sure only current versions are used in applications, gate papers and tenders.
4. Maintain registers for land agreements, consents and conditions, contracts, insurance, connection correspondence and consultant deliverables.
5. Prepare and maintain the data room for each project at Gates 5 and 6, with an index that a buyer's adviser can navigate.
6. Issue transmittals for drawings and specifications to consultants and EPC contractors and track responses.
7. Take and circulate minutes of the Investment Committee and project control meetings, with an action log.
8. Run periodic audits of document control compliance, and report gaps to the Chief Financial Officer and the project owner.
9. Apply access rules to confidential, commercially sensitive and culturally sensitive documents, and keep an access log.
10. Train staff in document control procedures, and archive completed project files in line with the retention policy.
What you bring (essential)
1. At least three years in document control, records management or project administration in construction, engineering or energy.
2. Experience with an electronic document management system such as SharePoint, Aconex or Procore.
3. Accuracy with detail, naming rules and revision control.
4. Understanding of drawing and specification control, and of transmittals.
5. Competence in Microsoft 365, including Excel for registers.
6. Ability to work with engineers, lawyers and external consultants and to chase documents without friction.
7. Discretion with confidential commercial and heritage information.
8. A Certificate IV or diploma in business, records management or a related field, or equivalent experience.
Desirable
1. Experience preparing data rooms for a sale or financing.
2. Familiarity with ISO 9001 document control requirements.
3. Experience on a renewable energy project.
4. Experience with workflow automation in SharePoint or Power Automate.
5. Records management qualifications.
Your first 90 days
Days 1 to 30: Audit the existing files for five projects and agree the folder structure and naming convention with project owners. Migrate Burra Creek and Appila files first.
Days 31 to 60: Set up the land, consent, contract and connection registers. Migrate the remaining projects. Issue the document control procedure.
Days 61 to 90: Run the first audit and issue the report. Prepare the Burra Creek data room index. Train all staff on the procedure.
How success is measured
1. A requested document is retrieved within one business day, with its current revision confirmed.
2. Audits find no more than two uncontrolled or superseded documents in use at any review.
3. The Burra Creek data room index is complete and checked against the gate evidence list at Gate 5.
Screening questions
1. How do you stop two people editing different versions of a consultant's report?
2. Describe the naming convention and folder structure you set up on a previous project. What would you change?
3. What would you put in a data room index for a project preparing for sale?
4. How do you manage a consultant who submits documents late and in the wrong format?
5. How would you handle a request for access to a restricted heritage file?
How to apply
Email [email protected] with your resume and a short note on what you want to own here, quoting the role title. Answer the screening questions in your note. We read every application and reply to all of them.