Engineering

Grid Connection Engineer

Full-time

/

Adelaide, SA

/

Hybrid

About Saltbush

Saltbush Renewables is an Adelaide-based developer of utility-scale solar, wind and co-located battery storage in South Australia and western Victoria. It takes projects from site origination through land, approvals and grid connection to financial close, then manages construction and hands each project to its owner-operator. It was established in 2026 and begins operating in January 2027, with five projects totalling 1,510 MW in its opening pipeline.

About the role

The Grid Connection Engineer takes each project through the NER Chapter 5 connection process, from the first enquiry to an executed connection agreement and AEMO-accepted performance standards. The role is the project's technical voice to ElectraNet, AusNet and AEMO. It exists because connection is the longest and least predictable gate in South Australia, and a credible pipeline needs an engineer who can read a network study and know what it means for the project.

Terms

Full-time, permanent. Adelaide CBD, hybrid (three days a week in the office), with field travel to the Mid North, Limestone Coast and western Victoria. Reports to the Lead Electrical Engineer.

Remuneration

A$145,000 to A$170,000 plus 12 per cent superannuation. Industrial instrument: Professional Employees Award 2020 (MA000065), Professional Engineer Level 3.

What you will do

1. Prepare and lodge connection enquiries and applications with ElectraNet, AusNet Services and SA Power Networks.

2. Assess network hosting capacity, fault level and system strength at candidate connection points.

3. Negotiate generator performance standards, including any negotiated access standards, with the network provider and AEMO.

4. Commission and review R1 and R2 dynamic models and power system studies (load flow, short circuit, stability, harmonics, voltage control).

5. Brief the Lead Electrical Engineer and Development Manager on connection cost, programme and risk at each gate.

6. Negotiate the technical schedules of the connection agreement, including network augmentation scope and cost allocation.

7. Define the scope split between contestable and network-provider works and record it in the responsibility matrix.

8. Prepare commissioning plans and hold-point test procedures for AEMO and the network provider.

9. Prepare the technical evidence for AEMO registration with the Commercial Manager.

10. Maintain the connection tracker for every project, with queue position, study status and correspondence.

What you bring (essential)

1. A degree in electrical or power systems engineering.

2. At least five years in transmission or generator connection work in the NEM.

3. Working knowledge of NER Chapter 5 and clause S5.2.5 access standards.

4. Experience with at least one of PSS/E, PSCAD or DIgSILENT PowerFactory, or with reviewing models built in them.

5. Understanding of system strength, grid-following and grid-forming inverter behaviour and fault ride-through.

6. Ability to write a technical response to a network provider that a non-engineer can follow.

7. Chartered or registered engineer status, or eligibility within 12 months (Engineers Australia CPEng; registration under the Professional Engineers Registration Act 2019 (Vic) where services are provided in Victoria).

8. A current driver's licence and willingness to travel to substations and network-provider offices.

Desirable

1. Previous work with ElectraNet or AusNet Services.

2. Experience commissioning a battery energy storage system with AEMO hold-point testing.

3. Experience with Integrated Resource Provider registration.

4. Scripting skills (Python) for model validation and study automation.

5. Experience with the Eyre Peninsula or South East networks.

Your first 90 days

Days 1 to 30: Read the connection files and correspondence for all five projects. Meet the ElectraNet and AusNet connection teams. Issue a connection tracker.

Days 31 to 60: Draft a connection strategy for each project, with queue position, study scope and cost range. Identify the model and study gaps for Burra Creek.

Days 61 to 90: Brief the Investment Committee on connection risk across the pipeline. Submit the next required enquiry or study request on each of Burra Creek, Appila and Penola.

How success is measured

1. Burra Creek reaches an executed connection agreement and AEMO-accepted performance standards by the Q3 2027 target.

2. Every project has a current connection tracker, with no network-provider request unanswered after ten business days.

3. No connection cost estimate at a gate is revised by more than 15 per cent at the next.

Screening questions

1. Describe a performance standard you negotiated that the network provider first rejected. What did you change?

2. How would you decide whether a 132 kV or a 275 kV connection is better for a 300 MW solar and battery project?

3. What does a system strength shortfall look like in a network study, and what are the options for resolving it?

4. Which models have you built or reviewed for AEMO acceptance, and what did AEMO query?

5. A network provider quotes a connection programme that is twelve months longer than ours. How do you test it?

How to apply

Email [email protected] with your resume and a short note on what you want to own here, quoting the role title. Answer the screening questions in your note. We read every application and reply to all of them.

Apply Now

Have a site to assess?

Discuss a Project

Utility-scale solar, wind and storage for South Australia and western Victoria.